Home/Industries/Transport, shipping and logistics
The duty follows the freight, through companies you do not employ
In most regulated sectors an obligation binds the entity that holds the licence. In the movement of goods it binds every party in the chain, including parties whose staff, systems and records belong to somebody else. That is a dependency problem before it is a compliance problem.
The operating environment
A freight business of any size operates under several regimes at once, and almost none of them stops at the boundary of the company.
- Heavy vehicle law places duties on each party in the supply chain, so a consignor, a packer, a loader and a scheduler each carry a duty about conduct they influence rather than conduct they perform, and discharging it requires evidence of the steps taken.
- Vessel operations carry a safety management system, security duties at the ship and port interface, and survey and certification regimes assessed by a classification society and inspected again by port states without notice.
- Dangerous goods carry classification, packaging and segregation rules that differ between sea and road.
- Customs and trade compliance brings tariff classification, origin, and sanctions exposure attaching not only to a counterparty but to a vessel, its registered owner, its charterer and its flag.
- Ports and terminals are designated assets in their own right, so asset-attached critical infrastructure duties apply on top.
- Cold chain, biosecurity and fatigue management each add their own records.
Subcontracting is the normal operating model, so most of the activity that creates the obligation happens on somebody else’s asset.
Current pressures
The obligation attaches to influence, not to employment.
A scheduling decision made in an office creates a duty about a driver employed by another company, and the evidence that the duty was discharged has to exist in the first company’s records.
Counterparty exposure moves after the booking.
Ownership, charter and flag can change between the day a slot is confirmed and the day the vessel sails, and the screening that was current at onboarding is not current at departure.
Inspection is unannounced and evidentiary.
A port state inspection or a roadside intercept asks for the record as it stood, not for the policy that describes it.
Every movement touches several jurisdictions at once.
A single voyage can engage the flag state, the port state, a customs regime at each end and a sanctions regime that belongs to neither.
The freight, not the entity
Certification is a date that the booking system does not know.
A licence endorsement, a dangerous goods authorisation, a vessel certificate and a subcontractor’s insurance all expire, and the system that accepts the job has no view of any of them.
The same incident is reportable to several bodies on different clocks.
The fastest notification constrains the content of the slower ones, and it is usually drafted by whoever happened to be available.
Segregation and compatibility are rules applied by people.
What may travel beside what is a rules problem being solved from paperwork under commercial time pressure.
In most regulated sectors an obligation binds whoever holds the licence. The centre here is the consignment, because that is what the duty follows, and every one of these seven arrives at it rather than at the company.
The common approach
Operational systems carry the work: a transport management system for jobs and lanes, a terminal operating system for container moves, a fleet system for vehicles and maintenance, and a customs broker’s platform for declarations. Each is built for dispatch, throughput and billing, and each is good at it. Compliance sits beside them in a different place: a subcontractor register in a spreadsheet, certificates in a shared drive with a reminder calendar, a chain of responsibility policy as a document, counterparty screening performed once at onboarding by a finance or legal function, and an incident log maintained after the fact. The operational systems know what happened. The compliance records assert that it was permitted.
Where it breaks down
The chain of responsibility, running as intended
Reasonable steps cannot be evidenced from a dispatch record.
The duty is discharged by what the business did to influence an outcome, and the operational systems record the outcome. Eleven weeks later, proving that a schedule was checked against a fatigue limit means reconstructing intent from a timestamp.
The subcontractor register holds the contract, not the dependency.
It records who was engaged and on what terms. It does not record which lanes they actually run, which commodities they carry, which certifications lapsed last month, or which other parts of the network depend on the same carrier.
Screening is a point in time and the exposure is continuous.
A counterparty cleared at onboarding is not re-examined at the booking, so the question asked at the moment of risk is answered with evidence from the moment of least risk.
An expiry is a date in a document and nothing blocks the job.
The control exists, it is written down, and the operational system that assigns the work was never given the fact.
The chain cannot be walked.
When a consignment is found non-compliant, establishing which parties influenced it means asking several systems that hold no relationships between each other, under a clock.
A shared dependency is assessed four times as four risks.
One lashing contractor, one bunkering supplier or one port community system used across several terminals is a single point of failure that every local register records as a local arrangement.
Cold chain excursions are detected after delivery.
By the time the data logger is read the evidence of cause has moved, and the record that would attribute it was never joined to the movement.
A chain of responsibility is a graph: parties, consignments, assets and influence running in a direction. Each break below is a place where the graph is held as text instead, and the question the regulator asks cannot be walked.
Why this keeps happening
A chain of responsibility is a graph. It has parties, consignments, assets and influence running in a direction, and answering the question the regulator asks means walking it. A register built as a list cannot walk anything, because the relationships that make it a chain are held as text in fields. That single structural choice explains the subcontractor register, the untraceable expiry and the dependency counted four times. The architecture page sets out the structural causes and what the alternative is.
Illustrative scenarios
Constructed illustrations, not customer case studies.
The owner changes between booking and sailing. A slot is confirmed on a Friday. Over the weekend the registered owner of the vessel changes, and the new owner appears on a restricted list. The questions that follow are all evidentiary: what was screened, when, against which list as it stood on that date, who was notified, and what record shows that the screening was current at the time it was relied on. A screening result held with its validity period answers it; a screening result held as a field that was overwritten does not.
An intercept finds an overloaded container. The duty runs back through the loader, the packer and the consignor, and each has to show the steps it took. Where the consignment, the parties and the influence between them are held as related records, the chain is produced. Where they are not, three companies produce three partial accounts and the inconsistency between them becomes the finding.
One contractor across four terminals. A single service provider handles a function at four sites in three jurisdictions. A failure of that provider is one event. Four local registers describe four managed arrangements, and the correlation only exists where the dependency is modelled once across the group.
Applicable capability
- Risk Management — parties, consignments and assets held as related records with the direction of influence recorded, so a chain can be walked rather than assembled; dependency modelling that shows one contractor behind four local arrangements; assertions held with validity periods, so what was known on a given date can be reproduced; incident records with separate occurrence, detection and classification times feeding several notification obligations from one set of facts.
- Compliance — a maintained obligation library covering the transport, maritime, dangerous goods and trade regimes with their editions, mapped to controls, so one control tested once serves every obligation it satisfies and a certification expiry is data the operational decision can be checked against.
The frameworks tracked for this sector
The frameworks tracked for this sector are listed in the Framework Registry.