Home/Solutions/Roadmap

Roadmap

The public Solution Roadmap separates available capability from work in development, planned capability and areas still being explored — for both solutions, at capability level.

Buyers in regulated markets have to justify a vendor choice, and a published status is easier to justify than a verbal assurance. Publication also creates its own accountability: the states below have definitions, and movements between them are recorded.

The four states

Available

Released and in use. Anything in this state can be demonstrated.

In development

Actively being built. No release date is published — a date that slips costs more than it informs.

Planned

Committed and scheduled behind current work. The shape is settled and no release date is published; nothing here is a commitment to a date unless a contract states one.

Exploring

Under investigation, and possibly never built. Nothing in this state belongs in a purchasing decision.

Nothing moves to Available before release, and no item remains in Planned after the intention to build it has lapsed. Every release is recorded in the update log. Internal engineering detail, defect information and security findings do not appear here.

Where the line falls for a purchasing decision Static figure
Falling certainty Available Can be demonstrated In development No release date is published Planned No release date is published Exploring Possibly never built May stand in a purchasing decision Statements of intent, and the page says so

The four states and their definitions are beside this figure and are not repeated in it. What the figure adds is the line: one state can be demonstrated today, two publish no date, and one may never be built at all.

Solution
Area
State
66 of 66 shown

Arash

Risk and control

Risk register with configurable scales and impact dimensionsInherent, residual and target scores as numbers with history, on scales the organisation defines.
In development
Design and operating effectiveness as separate ratings“Well designed, not operating” is a reportable answer.
In development
Terminology aliasesThe organisation’s vocabulary, throughout the interface and reporting.
Planned
Risk matrix definitions as configurationMatrix size, bands and labels, set by an administrator.
In development
Assets as connected recordsConnected to the risks, services and obligations they carry.
In development
Continuous monitoring of indicators against thresholdsMeasures watched between assessments, with a breach raising work rather than a report.
In development

Assurance

First-line assessment and second-line challenge as separate recordsDisagreement preserved rather than overwritten.
In development
Control test plans with materiality-driven frequencyTesting effort follows consequence.
In development
Reproducible samplingA selection whose basis can be shown to an auditor.
Planned
Evidence store with provenance and retentionArtefacts held with the control — origin, integrity and retention recorded.
In development
Segregation of duties rules and breach eventsIndependence as configuration rather than remembered policy.
In development
Findings and actions across every subject, with consolidationOne remediation backlog instead of four.
In development
Audit trail carrying actor and reasonBeyond the versioned record of what changed.
In development

Resilience and third parties

Supplier register with criticality and recorded rationaleTied to the services each supplier supports.
In development
Due diligence with answer reuse and evidence per answerEach assessment starts from the last.
In development
External supplier portalSuppliers answer for themselves, scoped to what was asked.
In development
Contract obligations as structured evidenced factsA clause coverage position across the portfolio.
In development
Critical operations and service dependency modellingThe structure that makes impact traversal possible.
In development
Tolerances as approved numeric limitsMaximum outage, maximum data loss, minimum service level — versioned.
In development
Dependency impact traversalIf this fails: what breaches, and when.
In development
Multi-regime notification clocksWhich obligations start a countdown, and what each requires.
In development
Continuity as structured records with a testing programmeRather than an uploaded document.
In development
Incident register with occurrence, detection and notification timesThe times an incident’s obligations are measured from.
In development
Obligations and risks anchored to assetsFor regimes whose obligations attach to the asset rather than the organisation.
In development

Decisions and reporting

Role-based dashboards with drill-through to source recordsEvery figure leads back to the records that produced it.
In development
Self-service report buildingWithout SQL and without a consultant.
Planned
Documented reporting schema for external analytics toolsFor teams with an established practice.
In development
Loss event data with separate occurrence, detection and classificationStructured well enough to model from.
In development
Quantitative modelling and loss exceedanceDistributions with stated assumptions and traceable inputs.
In development
Scenario and control-failure cascade analysisConsequences followed through the dependency structure.
In development
Correlated aggregation with stated boundsIndependent and fully-correlated cases rather than a single false figure.
In development
Bow-tie analysis with controls as barriersBarrier condition drawn from actual effectiveness ratings.
In development
Calibration workflow for risk estimatesStructured elicitation, with each estimate recorded against its estimator and date.
In development
Board packs produced from the operational recordsOne set of records behind the operational view and the board material.
In development

Platform, identity and deployment

Database-enforced isolation between organisationsEvaluated beneath the application layer.
In development
Single sign-onStandard enterprise identity integration.
Planned
Automated user provisioningJoiners, movers and leavers handled from the organisation’s directory.
Planned
Multi-factor authenticationA second authentication factor at sign-in.
Planned
Roles and permissions configured by administratorsEnforced at the data layer rather than in the interface.
In development
Workflow and approval routing as configurationWho reviews and approves what, set by an administrator.
In development
Point-in-time record historyThe state of any record on any past date, reconstructable.
In development
Bulk import with actionable validationErrors reported in terms an administrator can act on.
In development
Retention by record class, with legal holdPreserved records exempt from retention-driven deletion until the hold is released.
In development
Full data export in documented formatsAt any time, without assistance.
In development
Record and field-level classification with enforced accessFor classified and protectively marked material.
In development
Classification inheritance and protective markings on exports and API responsesA report over mixed records takes the highest applicable marking.
In development
Hosted operationRun as a service, in a stated region.
Planned
Single-tenant deploymentOne organisation per database, within the hosted model.
Planned
Installation into a customer-controlled environmentInstalled into infrastructure the customer owns and administers.
Planned
Installation into environments with no outbound connectivityUpdated by signed offline bundles.
Planned

Compliance capability within Arash

Maintained framework library with editions and successionAssessments against a superseded edition stay valid against that edition.
In development
Typed cross-framework mappings with rationale and sufficiencyEquivalent, broader, narrower, partial or related — not an undifferentiated “mapped”, with sufficiency as a separate judgement.
In development
Framework change detection and impact analysisWhich controls and coverage positions a change touches.
In development
Suggested risks and controls for human reviewRecommendations with their reasoning, never applied automatically.
In development
Policy attestation campaigns with exception handlingThe cycle around a policy, not just the document.
In development
Machine-assisted mapping with citation and human confirmationEvery suggestion carries its source and a recorded decision.
In development
Reference content packagesReference data installed as versioned packages rather than loaded by hand.
In development

AI governance and assistance

AI systems registerEvery AI system in use, with its purpose, its owner and its risk classification.
In development
Assistive AI with recorded citationsEach suggestion names the sources it drew on, and the decision a person made about it is recorded.
In development

Cloudient

Attribution and ownership

Cost attribution to services, teams and productsIncluding a defensible treatment of shared and untaggable cost.
Exploring
Accountable ownership per cost centre, with unowned spend as an exceptionThe exception list — spend with no owner — is the output to watch.
Exploring

Budgets and forecasting

Budgets, variance and driver-separated forecastingSo variance can be explained rather than only reported.
Exploring

Efficiency and commitments

Idle and oversized capacity identification with recorded decisionsRemoved, retained with a reason, or deferred — each with an owner.
Exploring
Commitment coverage and utilisation reportingBoth figures — coverage alone hides paid-for capacity nobody uses.
Exploring

Unit economics and reporting

Unit economics: cost per customer, tenant, transaction or serviceWith allocation method and denominator definition stated alongside.
Exploring
Showback and chargeback reportingAgainst an allocation method finance will accept.
Exploring

Reading this honestly

A roadmap is a statement of intent, not a contract. Items in development or planned may change, be reordered or be dropped when evidence shows they are the wrong thing to build. Where a capability matters to a purchasing decision, the reliable course is a written answer to a direct question.

Last reviewed .

A statement of intent, and the rules it is still held to Static figure
What it is not A commitment to a date — unless a contract states one An order of delivery: items may be reordered A guarantee: an item may be dropped when evidence shows it is the wrong thing to build
What it is still held to Nothing moves to Available before release No item remains in Planned after the intention to build it has lapsed Every release is recorded in the update log

The left column is what a roadmap cannot promise, which most roadmaps say. The right is what this one is nevertheless bound by, which is the part worth checking against it. Last reviewed is stated on the page.