A well-kept register still cannot say what happens next.

The hard part is the question that follows: if this happens, what breaks, how long remains, and what was relied on to stop it?

A list cannot answer that, however well maintained.

The answer lives in the relationships between things — and relationships have to be modelled deliberately, not reconstructed from a spreadsheet at the moment somebody asks.

Arash connects risks, controls, services, suppliers, obligations and evidence in one decision model, built around a single progression.

Registers → Relationships → Evidence → Consequences → Decisions

Registers record what is known: risks, controls, suppliers, services, incidents, obligations.

Relationships connect them, so each record sits in context rather than in a column.

Evidence establishes whether a control was designed properly and is operating in practice — two separate questions with two separate answers.

Consequences follow the relationships outward: what is affected, how badly, by when.

Decisions are what the organisation does about it, recorded with the information available at the time.

Each stage depends on the one before it — which is why analytics bolted onto a register cannot supply what the register lacks. The relationships were never there to analyse.

One event, followed through

A single, unremarkable event: a supplier providing a depended-on service stops delivering.

One event, followed through the model Step through
One event, followed through the model Eight record types and the links between them. The supplier is the event. Each of the six questions below reaches further into the model: services and the operations that depend on them, then the tolerances at risk, then the controls meant to prevent it, then the evidence that they were operating, then the obligations triggered, then the decision and the context it was made in. Each part stays marked once it is reached. EVENT Supplier 1 Services 1 Operations 2 Tolerances 3 Controls 4 Evidence 5 Obligations 6 Decisions
Each question reaches further into the model and what it reaches stays marked. The supplier is the event; everything the traversal reaches is something the model already held.

Which services are affected?

The supplier is not a row in a vendor list. It is connected to the business services it supports, and those services to the operations that depend on them. Following the links produces the affected set — including the second and third order dependencies that only appear when the model is traversed rather than remembered.

Which tolerances are breached, and when?

Critical operations carry tolerances: maximum tolerable outage, maximum acceptable data loss, minimum service level — numbers with units, approved and versioned, not adjectives in a policy document. The moment the affected set is known, so is the list of tolerances at risk and the time remaining on each. An incident becomes a clock instead of a discussion.

What was meant to prevent this?

Every risk carries the controls intended to prevent, detect or contain it. Each control carries two ratings, kept apart deliberately: whether it is well designed, and whether it is operating. “Well designed but not operating” is a real and reportable answer, and a single blended rating hides exactly the situation that most needs to be seen.

Is there evidence the control was working?

The last test of that control, when it was performed, how the sample was chosen, what the result was, and the artefact that proves it — held with the control, not beside it. That is the difference between believing a control was operating and being able to show it to somebody who does not take assertions on trust.

What must be reported, and by when?

The affected services and breached tolerances identify which obligations may be triggered. Each carries its own notification requirement and its own clock, and where several regimes apply at once, all of them run in parallel with different deadlines and different content requirements. Knowing that on day one, rather than reconstructing it on day four, is often the difference between a notification and a finding.

Whether an obligation is engagedWhether a particular obligation is engaged remains a judgement for the organisation and its advisers. The system surfaces what to consider, not what the law concludes.

What was decided, and what was known?

The decision is recorded, and so is its context. Because every record keeps its own history, “what did the register look like when this decision was made” has an answer months later. Reviews and inquiries are not conducted with today’s data. They are conducted with the data that existed at the time.

Where this goes deeper

Assurance — first-line assessment, second-line challenge, control testing, sampling, evidence and findings. The Evidence stage.

Resilience and third parties — critical operations, dependencies, tolerances, suppliers, concentration and notification clocks. The Consequences stage.

Quantification and reporting — loss modelling, scenario and cascade analysis, and results in front of the people who decide. The Decisions stage.

Adoption — implementation, configuration, migration, security, deployment and licensing.

Arash — the solution itself, and the roadmap separating available capability from work in development.

Which deeper page continues which stage Static figure
The progression Registers Relationships Evidence Consequences Decisions Assurance First-line assessment, second-line challenge, control testing, sampling, evidence and findings Resilience and third parties Critical operations, dependencies, tolerances, suppliers, concentration and notification clocks Quantification and reporting Loss modelling, scenario and cascade analysis, and results in front of the people who decide Not a stage Adoption is how it is put in; Arash is the software itself

Three of the five pages below continue a named stage of the progression, and two of them are not stages at all. The page says both things in prose; this says which is which at a glance.

Configured, not implemented

Planned — Risk scales, impact dimensions, matrix definitions, control effectiveness models, testing frequencies and terminology are configuration held as data, changed by an administrator. A five-by-five matrix is a starting point rather than an assumption; an organisation rating impact across financial, customer, regulatory and safety dimensions with different bands for each is describing a configuration, not a change request.

This matters more than it sounds. Risk platforms become dependent on their vendors when the model is compiled in.

Where the model lives Static figure
Compiled into the product The scales, the matrix and the effectiveness model are the vendor's Changing one is a release, and the release is the vendor's to schedule The organisation's method bends toward the software
Held as data Risk scales, impact dimensions, matrix definitions, control effectiveness models, testing frequencies and terminology Changed by an administrator A five-by-five matrix is a starting point rather than an assumption

The page's sentence is that this matters more than it sounds, and the reason is on the left: a model compiled into the product is a dependency on whoever compiled it. Planned capability — see the roadmap for what is available today.

The organisation’s own language

Planned — Organisations do not agree on terminology, and adopting a vendor’s vocabulary should never be a condition of using a system. Where a framework calls something an issue rather than a finding, or a treatment rather than an action, the alias is recorded once and used throughout the interface and reporting.